A. Following tentative map approval and prior to submittal of the final map or parcel map, improvement plans shall be submitted for checking and approval by the City Engineer. All improvement drawings shall be on twenty-four-inch by thirty-six-inch sheets and shall show the complete plans, profiles and details for all improvement work. When applicable, reference may be made to City standard details in lieu of duplicating the drawings thereon.

B. Prior to occurrence of improvement plan checking, all of the following shall be submitted to the City Engineer:

1. Two (2) prints of the improvement plans.

2. Two (2) prints of the final map or parcel map.

3. One copy of map calculations.

4. Two (2) prints of the grading plan.

5. Two (2) prints of the drainage plan.

6. One copy of drainage calculations.

7. One copy of the detailed soils investigation and report.

8. One copy of the cost estimates.

9. One copy of the preliminary title report.

10. Plan checking fees.

11. Two (2) copies of the Stormwater Control Plan as required by Larkspur Municipal Code Section 9.11.110.

C. A utility plan showing the location of proposed utilities shall be required but may be submitted following approval of improvement plans. This plan shall bear signature blocks indicating approvals of the involved utilities.

D. Upon receipt of the required information, the City Engineer shall check the improvement plan for compliance with the provisions of this title, standard engineering practices and any other requirements of the City. Prior to approval of the improvement plan, the City Engineer shall secure from the proper authority written approval of plans and specifications for sewer lines and sewage disposal systems. The City Engineer shall require the plans to conform to all conditions of approval of the tentative map and shall require the applicant to revise the plans as necessary to make them complete and correct. When complete and correct, the City Engineer shall approve the final maps and the improvement and grading plans.

E. Following construction, but prior to the City Engineer’s final inspection of improvements, the developer shall submit to the City Engineer one set of reproducible “as-built” grading and improvement plans indicating all changes and field adjustments which deviate from the approved plans. (Ord. 1030 § 2(11), 2018; Ord. 1005 § 9, 2015; Ord. 584 § 1 (part), 1977)