Skip to main content
Loading…
This section is included in your selections.

A. The City Engineer shall make all inspections necessary to ensure that all construction conforms to the approved improvement plan. Required inspections shall consist of at least the following:

1. Road subgrade prior to placing the rock base.

2. Road base prior to placing or surfacing.

3. Concrete forms.

4. Concrete pouring.

5. Sewerage facilities and structures when adequate review and inspection is not provided by other agencies.

6. All other facilities, utilities, improvements, monuments, grading and filling shall be inspected on a schedule approved by the City Engineer.

7. Final inspection upon completion of all improvements.

B. The subdivider shall notify the City Engineer upon the completion of each construction stage listed in subsection (A) of this section and shall not proceed with further construction until authorized by the City Engineer.

C. Prior to recordation of the final map, the subdivider shall deposit with the City the inspection fee determined by the City Engineer to cover the cost, including the cost of any engineering consultant, for inspection of required improvements other than utility facilities. (Ord. 1030 § 2(11), 2018; Ord. 584 § 1 (part), 1977)